Home / Free tools / Production Deadline Pace Checker
Free tool

Production Deadline Pace Checker

Checks whether your team can review, stamp and package a document production before the deadline, and shows the daily pace required versus the capacity you have.

Your numbers

Results update as you type.

Your estimate

Pages required per day...
Team capacity per day...
Business days needed at full capacity...
Verdict...

Estimates only. Assumptions are listed below, and you can change every input.

A production deadline is a capacity problem dressed up as a legal one. There are only so many business days left, only so many people who can review and stamp, and each of them has a limited number of focused hours in a day. When the page count is large, the honest question is not whether the work is possible but whether the daily pace is achievable with the staff you actually have.

This checker converts your page count, contingency allowance and days remaining into a required pages per day figure, then compares it with the daily capacity of your team: people, focused hours per person, and pages each person can process per hour including review and stamping. It reports the margin or the shortfall and how many days the work would take at full capacity. The throughput number is yours to set; the tool does not assume what a reviewer can do.

How to use this tool

  1. Enter the pages remaining and the business days left before the production must go out.
  2. Enter the people available, their focused hours per day and a realistic pages per hour figure.
  3. Add a contingency percentage, then read the required pace, the capacity and the verdict.

What the math assumes

  • Required pace equals the page count times one plus the contingency percentage, divided evenly across the business days left.
  • Daily capacity equals people times focused hours times pages per person-hour, with no ramp-up or fatigue effect.
  • Pages per hour covers the whole cycle for a page: review decision, stamping and a quick check; set it from your own past productions.
  • The contingency percentage is added to the page count only; it does not remove days from the calendar.
  • If the page count is zero or capacity is zero, the tool reports that in words rather than dividing by zero.

Frequently asked questions

What pages per hour figure should I use?

Look at a recent production and divide the pages produced by the person-hours it took including review. If you have no record, run a one hour test on a sample set and measure. Guessing high is the most common way this estimate fails.

The tool says we are short. What are my options?

Add people, add hours, reduce the page count by narrowing scope or rolling part of the production, or ask for more time. The shortfall figure tells you roughly how many extra person-hours per day would close the gap.

Why add contingency to pages instead of removing days?

Because re-work shows up as more pages to touch, not fewer days on the calendar. Either approach works; the tool uses pages so the daily pace figure stays directly comparable to your capacity.

More free tools from PdfStampr

  • Bates Number Range Planner: Estimates the last Bates number of a production, the next safe starting number and how much room your digit padding has left, for paralegals and litigation support staff.
  • Bulk Stamping Labor Savings Calculator: Estimates how many staff hours and dollars a legal team saves each month by batch-stamping PDFs instead of stamping pages one file at a time.

Bates Numbering Without The Headache

Bulk PDF stamping and Bates numbering.

Start free trial